Cumberland Plain Socio-Economic Impact Assessment

E-mail Print
Client:  NSW Department of Environment & Conservation

The Cumberland Plain is the area of the Hawkesbury-Nepean river plain separating Sydney metro area from the Blue Mountains.  This area has experienced significant clearing of native vegetation and is under severe development pressure as Sydney expands.

The NSW Department of Environment & Conservation (formally NSW National Parks and Wildlife Service) has developed a draft Recovery Plan for the Cumberland Plain. It focused on assessing the impacts of a range of conservation targets, two of which were a short term target of “net gain” through to a long term target of 30%. The Department wished to assess the socio-economic impacts of the Draft Plan in order to provide context to the targets proposed and a comparison to the scenario of not implementing the plan.  The assessment outputs have been used to inform Government decision making on the implementation of the Recovery Plan.

Spatial Vision was commissioned, as part of the consortium team, to undertake the assessment. The assessment methodology was based on the optimisation of a set of scenarios developed to explore options for meeting the Plan’s key remnant vegetation retention targets achieved through the selection of combinations of vegetated and potential revegetation landscape units. These units or “clumps” were derived from the current extent of the endangered ecological communities of Cumberland Plain.

“…halt the loss and achieve a net gain in the extent and condition of bush on the Cumberland Plain”

A critical input to the assessment process was a comprehensive database of environmental, planning and economic attributes that were derived from spatial information sourced from NSW government agencies. Spatial Vision’s role was to provide design input to the project’s scope and also provide spatial recommendations to develop the procedures that created the required spatial attributes. In-turn, Spatial Vision developed the optimisation database and to created the visualisations of the results from the various optimisation scenarios.

The resultant database maintained a link to the base landscape units (clumps) thus enabling an efficient and user-friendly visualisation database with all input variables, weightings and scenario outputs.

 

Demonstrated Capabilities

  • Ability to develop efficient and practical methodologies to meet requirements within the constraints of current information and tight project timelines.
  • Extensive expertise in the collation and standardisation of spatial data as a preparatory stage to use in complex analytical procedures.
  • Ability to work in multi-disciplinary teams and with expert groups to achieve a common goal.
  • A high degree of expertise in the development of modular analysis and data development procedures that provide efficient information development and flexibility for client/expert scenario development.

Resources

 Milos Pelikan developed the spatial analysis and data development methodologies employed in this project and managed the project interaction between Spatial Vision the consortium partners and the Client.

Technologies Applied

  • ArcGIS 8.3
  • Spatial Analyst (ArcInfo GRID)

A key feature of the approach developed by the consortium was the maintenance of the spatial link to individual landscape clumps throughout the selection process.  This linkage enabled each scenario to be visualised and thus assist in both understand and communicating the impacts of the Recovery Plan scenario.  This study is a landmark in the coupling of GIS and optimisation methodologies to assess the impacts of strategic planning options.  The concepts and general approach developed by the consortium have relevance to a wide variety of strategic planning disciplines.

The key success factors of this project were a combination of:

  • the efficient data collation, development and management procedures implemented by Spatial Vision.
  • the collaboration and input from economic and planning specialists from Marsden Jacobs and SGS with GIS analysis specialists from Spatial Vision
  • the modular database development procedures implemented by Spatial Vision that allowed for incremental review and quick integration of the data variables requested by the client and the rapid exploration of alternative options.

     
Last Updated ( Thursday, 17 September 2009 11:37 )  

Sector Projects by Spatial Vision

Resources - Natural Resource Management

Best Practice NRM Tools 2009 Workshop

On July 24th 2009, Spatial Vision held a workshop for CMA officers to learn and share their knowledge about 'best practice' Spatial Information Management tools and techniques that could be used to support improved NRM decision making....

Read more...

Best Practice NRM Tools 2008 Workshop

On June 12th 2008, Spatial Vision held a workshop for CMA officers to learn and share their knowledge about 'best practice' Spatial Information Management tools and techniques that could be used to support improved NRM decision making....

Read more...

Resources - Natural Resource Management Websites

 
National Land and Water Audit The National Land and Water Audit provides data, information and nationwide assessments of Australia's land, water and biological resources to support sustainable development.
Australian Natural Resources Atlas The Australian Natural Resources Data Library. The place to look for natural resources data and information about that data
Department of Sustainability and Environment - Land Management Victoria's approaches to land management including references to the Catchment Management Authorities.
ASRIS
Australian Soil Resource Information System (ASRIS) provides online access to the best publicly available information on soil and land resources in a consistent format across Australia.
NSW Catchment Management Authorities An overview of Catchment Management Authorities (CMAs) have been established across the State by the New South Wales Government.